Construction power

Power on the building site, from day one

The foundations cannot wait for the grid operator. With a rental generator from Homan your site runs from the very first day: tower crane, site cabin, tools and drying equipment.

Sound familiar?

When the grid is not there yet

New build without a connection

The construction connection takes months to arrive. A generator bridges that period, from the first excavator to handover.

Heavy equipment

Tower cranes, hoists and drying equipment demand serious power. The power calculator works out what you need, so nothing comes to a standstill.

Building in a residential area

Our generators are super silent. That keeps the neighbours on your side, even when the generator starts early and stops late.

How it works

From request to power

One phone call or request and we take care of the rest, from the right capacity to delivery and collection.

Step 1

Determine the capacity

You tell us what needs to run on site and together we determine the right capacity. Not sure? The power calculator points the way.

Step 2

Quote in no time

You receive a clear quote with everything included: rental, transport and, if needed, cables and distribution boxes.

Step 3

Delivered and installed

We deliver to the site, position the generator and make sure it runs. Connecting it is done by you or your electrician, since you know your installation and switchboard best.

Step 4

Running as long as needed

From a week to the entire construction period. Extending is always possible, and our breakdown service is there if anything goes wrong.

The right setup

What we use for this

For most building sites the 100 kVA on a trailer is the workhorse. Large projects with cranes and hoists choose the 250 kVA.

Need more power or a linked setup? We arrange that too. Cables and distribution boxes can be rented separately, so the power gets exactly where it is needed.

Frequently asked questions

Good to know

How quickly can a generator be on my site?

Usually within 24 hours. Call us in the morning and we immediately check what is possible the same or the next day.

Can I also rent cables and distribution boxes?

Yes, cables and distribution boxes are included in the same quote. That way the power from the generator reaches every floor.

What if construction overruns?

Extending is no problem. One phone call or email and the generator stays as long as you need it.

Can a generator run in a low-emission zone?

With every request we automatically check whether the delivery address is inside a low-emission zone and choose the appropriate transport. You will see this in the quote.

Power for your building site?

Request a quote or give us a call. Then you will know where you stand today.